PDVSA

VENEZUELA: 2014-2015

ONSHORE FIELDS: JUSEPIN,ROBLOTE,TOMOPORO & OROCUAL

OFFSHORE FIELDS: CORO CORO

PDVSA
VENEZUELA
The service was provided continuously for a period of 12 months, in which the reduction of operational uncertainty was achieved in highly complex areas with pipe binding problems, achieving a reduction of non-productive times of 29% thanks to the synergy of multidisciplinary teams with our experts in perforation and geomechanics.
PDVSA
VENEZUELA
The capture of the data with the Mudlogging operator was established, since it did not have the standard WITS 0, before which our experts managed to establish the capture of the data directly from the operator's instruments, supplying the customer according to its guidelines in XML formats and open database for analysis and discussion.

YPF

ARGENTINA: 2015

ONSHORE FIELD: VACA MUERTA

YPF
ARGENTINA
During a period of 6 months a pilot test was carried out in a total of 7 wells, they had the service and remote support required by the client demonstrating the strength and solidity of our service in RTO, which without affecting the operations or the Voice and data services of the client managed to provide a continuous service that additionally generated geomechanics drilling simulations that drove the production increase by 28% during this period of time.

Register and receive our latest news